• slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
Buildings / Institutional

City of Health



Dimensions:

- Total area of the complex: 110,000 m2n- Construction Area Traumatology Hospital: 22,185 m2n- Maternity Hospital construction area: 12,200 m2n- Pediatric Hospital Construction Area: 12,000 m2n- General Hospital and Specialties construction area: 25,000 m2


Location:

Santo Domingo, Dominican Republic

Contractor:

CARIMEX

Termination date:

August 2008


Civil works and metal structures for the hospital complex consisting of four units: Hospital de Traumatología, composed of five blocks of buildings of five levels; Maternity and Pediatric Hospital and a General and Specialty Hospital. These are arcaded buildings on pedestals in reinforced concrete.

ESTRELLA companies that participated in this project

Design and civil work for building.

Manufacture and installation of metal structures.

Dosing, transfer and placement of hydraulic concrete.


Data of interest

One of the most ambitious hospital projects that have been built in the country.nnThroughout the construction, metal structures with deep levels of curvature stand out, a real challenge for our structural engineers and their manufacture and installation.

buy discord members - deneme bonusu veren siteler - canlı casino siteleri - Hipercasino - sweet bonanza oynabuy discord members - deneme bonusu veren siteler - canlı casino siteleri - Hipercasino - sweet bonanza oyna